Processes is the design and run-review studio#
Use Processes when the question is about how work should run, not just what is blocked today. The studio contains the workflow library, forms and rules, operator views, schedules, reviews, simulations, and run history that are available to your workspace.
Find the kind of process work you need#
The library uses these primary groups:
| Area | Use it for |
|---|---|
| Recently updated | Return to your latest workflow, form, or view work. |
| Workflows | Build the published and draft workflows that operators run. |
| Forms & rules | Define process forms, decisions, instructions, and reusable rules. |
| Views & boards | Connect an entry page or work board so people can find a workflow in Activity. |
| More | Open supporting areas such as Journeys, Work areas, Team roles, Notes, Schedules, Reviews, and Runs. |
Open Notes to turn notes and imports into process drafts.
From the home page, Continue building returns to recent work. Reusable kits are in Appstore under Workflow kits. Industry apps such as Auto Repair do not run on Processes; turn them on in Appstore. The create menu starts a workflow, form, or view; it does not publish any of them by itself.
Save, review, and publish a version#
Use this loop for a change that should reach operators:
- Open an existing workflow or create one from the library.
- Add its steps, forms, rules, and connected views. Keep the form fields and record relationships that later steps need.
- Select Save draft while you are still editing.
- Select New version when you need a new version of the workflow. This is the current label for a revision; the prior version remains the reference until the new one is published.
- Use Simulation to inspect the proposed behavior and Open reviews when another person needs to check the change.
- Select Publish only when the version and its connected forms and views are ready for live work.
Forms and views connected to a workflow version become available to operators only after the changes are saved and published. A workflow also needs a published, connected entry page or work board before it can be found in the corresponding Activity view. A workflow does not automatically become a board, schedule, or Activity action just because it exists in the library.
Schedules, reviews, simulations, and runs are separate areas in the studio. A schedule is used only when the workflow has an appropriate schedule and the viewer has access to it. Open Runs to inspect the result of work that has actually run.
Forms and customer documents#
New forms, rules, and instructions are created as Internal and Active resources. Importing a form or rule uses the same defaults and creates a new resource. A saved resource shows its current visibility and retention settings; saving another version keeps those settings. The resource builder and file importer do not change sharing or retention policy.
When a workflow involves an invoice, signature, payment, or another customer document, configure the required form and document actions explicitly in the workflow. The Documents guide explains files, templates, sharing, and signing.
Save and publish the workflow version before operators can use those connected forms or views. Saving a draft or preparing an estimate does not send a customer message. Whether a document is issued, sent, signed, or paid depends on the configured steps, the current record state, and the permissions of the person taking the action.
Keep internal process review separate from a customer's approval or signature. Request customer approval for estimates, work authorizations, or additional work before that work starts. The normal invoice flow is Send invoice → Pay → Receipt; do not add a second customer approval step to the invoice.
If a published change is missing#
Check that you saved the current version, published it, and connected the form or view to that version. Then check that the Activity Work view is assigned to the intended role and that the person has the required access. If the workflow is visible in Processes but not in Activity, the missing connection or assignment is usually the reason.